The proposed dock is located behind the Rehoboth Beach Museum adjacent to the canal bridge and will connect Lewes, Rehoboth Beach, and Dewey Beach. It will accommodate two 30-foot pontoon boats and a kayak/canoe launch. The estimated cost is $826,000 and the project has already received over $400,000 in grants and private donations.
|